Our Construction Drying Services
Pre-Flooring Moisture Testing Before installing finished floors, we test:
Concrete Slabs:
- Calcium chloride testing (ASTM F1869): Measures moisture vapor emission rate
- Relative humidity testing (ASTM F2170): Measures internal slab RH at 40% depth
- Surface moisture testing: Confirms surface is installation-ready
Acceptable levels:
- Hardwood floors: <3 lbs/1000 sq ft/24hr, <75% RH
- Laminate/vinyl: <4 lbs, <85% RH
- Tile: <5 lbs, <90% RH
Wood Subfloors:
- Moisture meter readings (pin-type and pinless)
- Acceptable: 12-14% MC for most applications
- Must be within 4% of flooring material MC
Certification Documentation: We provide written reports certifying moisture levels meet manufacturer requirements—protecting you from warranty disputes.
Accelerated Structural Drying When projects can’t wait months for natural drying:
Equipment Deployment:
- Commercial dehumidifiers (150-200 pint/day capacity)
- Air movers creating airflow across surfaces
- Heat (if appropriate for accelerating evaporation)
Typical Timelines:
- Concrete slab drying: 2-6 weeks (vs. 6+ months natural)
- Framing lumber drying: 3-7 days
- Post-flood construction: 5-10 days
Cost: $500-2,000/week depending on square footage and equipment needs
Water Intrusion During Construction Storms don’t respect construction schedules. When jobsites get wet:
Emergency Response:
- Remove standing water
- Extract from saturated materials
- Set up temporary weather protection
- Deploy drying equipment immediately
Damage Assessment:
- Determine what can dry vs. requires replacement
- Document for builder’s risk insurance
- Provide timeline for drying completion
Drying to Specification:
- Monitor daily moisture readings
- Adjust equipment placement
- Document progress for inspectors/owners
Common Scenarios:
- Slab flooded before roof completion
- Drywall soaked during installation
- Lumber packages exposed to rain
- Interior finishes damaged by roof leaks
Post-Plumbing Test Drying Plumbing pressure tests sometimes reveal leaks—after drywall installation. We:
- Extract water from walls and ceilings
- Dry insulation if salvageable
- Prevent mold in hidden cavities
- Document moisture levels before closing walls
Moisture Mapping for Due Diligence Before purchasing job sites or buildings:
- Complete moisture assessment
- Identify hidden water damage
- Provide reports for negotiations
- Recommend remediation scope
Why Contractors Choose Rock Solid
Fast Response: Construction delays cost thousands per day. We respond within hours to keep projects moving.
Proper Equipment: We own commercial-grade equipment—no waiting for rentals. Equipment arrives with trained operators.
Certified Testing: IICRC-certified technicians perform ASTM-compliant testing recognized by flooring manufacturers.
Insurance Expertise: We document for builder’s risk claims, helping recover costs from weather or plumbing failures.
Professional Documentation: Detailed reports with moisture readings, equipment logs, and photos satisfy inspectors and warranty requirements.
No Conflicts: We dry and test—we don’t install flooring or do construction. Our only interest is accurate results.
Moisture Testing Pricing
Basic slab testing (1-3 tests): $200-400
Comprehensive flooring prep (10+ tests): $500-1,000
Large commercial projects: Custom pricing
Emergency drying setup: $500-2,000 (equipment + mobilization)
Weekly drying service: $300-800/week (monitoring + adjustments)
Construction Drying Timeline
Consultation & testing: Same day or next day
Equipment mobilization: Within 24 hours
Typical drying duration:
- Concrete slab: 2-6 weeks
- Wood framing: 3-10 days
- Drywall/plaster: 3-7 days
- Water intrusion: 5-14 days
Final testing & certification: 1-2 days after reaching target levels
Common Construction Moisture Problems
Green Concrete: Concrete releases moisture for months. Installing flooring too early causes:
- Adhesive failure
- Plank cupping or crowning
- Mold under flooring
- Delamination
Wet Lumber: Framing lumber often arrives at 19-25% MC (too wet). Installing drywall and paint traps moisture, causing:
- Mold inside walls
- Drywall fastener pops
- Warping studs cracking drywall
Weather Delays: Open framing exposed to rain absorbs moisture. Without drying:
- Mold begins in 24-48 hours
- Insulation becomes ineffective
- Wood swells, complicating finish work
HVAC Not Operating: Many builders delay HVAC startup until near completion. Without climate control:
- High humidity slows drying
- Condensation forms overnight
- Materials equilibrate to ambient conditions (too wet)
Preventing Moisture Issues: Best Practices
During Construction:
- Cover materials during delivery and storage
- Close structures quickly (roof, windows)
- Run HVAC early for humidity control
- Schedule moisture testing before flooring
Before Flooring Installation:
- Test concrete at multiple locations
- Verify subfloor MC with meter
- Acclimate flooring materials 72+ hours on-site
- Don’t install during rainy periods without climate control
After Water Events:
- Call drying professionals immediately
- Don’t close up wet areas
- Document everything for insurance
- Test before proceeding

Keep Projects On Schedule With Professional Drying
Don’t let moisture delay completions or cause expensive callbacks. Our construction drying services keep your projects moving forward.
Available 24 hours a day, 7 days a week, 365 days a year
Call today to schedule moisture testing, emergency drying, or discuss your project timeline.